Product Categories

SLG630T Trailer-Mounted Coil Operating Device

SLG630T Trailer-Mounted Coil Operating Device

The SLG630T trailer-mounted coiled tubing unit is the flagship of SJ‘s coiled tubing lineup – delivering 620 kN (62 tonnes / 140.000 lbs) of continuous pulling force in a heavy-duty trailer-mounted package designed for the most demanding deep well interventions.

Field-Proven Performance – 6.121 Meters and Beyond:

The SLG630 has been field-proven in the Puguang Gas Field at 6.121 meters. In the Shengli Oilfield, SLG630 equipment has demonstrated cumulative operation mileage reaching millions of meters. The SLG630 has also successfully completed side-tracking horizontal well operations, proving its capability in the most demanding drilling applications.

3× Faster Operation – No Collar, No Interruption:

The SLG630T achieves no-collar, uninterrupted continuous pipe running and retrieval with operating efficiency more than 3 times that of conventional equipment. This isn‘t marketing hype – it’s field-verified performance.

Technical Specifications

Parameter SLG630T Specification
Maximum Pulling Force 620 kN (62 tonnes / 140,000 lbs)
Maximum Tubing Capacity 2″ × 8,000 m (standard)
Optional Tubing Capacity 2-3/8″ × 7,000 m (for long horizontal wells)
Applicable Tubing O.D. 3/8″ – 4-1/2″ (series range)
Configuration Type Trailer-mounted integrated
Transport Mode Trailer-mounted for road transport
Control System "One-key” automation
Automation Features 3 automatic drilling modes; 50% drilling time reduction
Stable Speed Control 0.1 m/min
Automation Efficiency 30% improvement via auto lubrication
Field-Proven Depth 6,121 meters (Puguang Gas Field)
Operating Temperature Wide range – desert to polar environments
Key Components 100% independently designed and manufactured
Certifications API Q1, ISO 9001, HSE



Applications – Where the SLG630T Excels

The SLG630T trailer-mounted coiled tubing unit is purpose-built for the most demanding well intervention operations. Here’s where it delivers the best return:

Application Description
Ultra-Deep Well Workovers Wells beyond 6,000 meters requiring maximum pulling power and tubing capacity
Deep Shale Oil & Gas Development Large-tonnage, large-diameter operations in深层页岩油开发
Long Horizontal Well Interventions Extended-reach laterals requiring 2-3/8″ × 7,000 m tubing
Side-Tracking Horizontal Wells Proven in side-tracking horizontal well operations
Well Cleanout & Sand Flushing Remove sand plugs and debris without killing the well
Acidizing & Stimulation Precisely place acid across target zones
Nitrogen Lift & Gas Lift Unload wells and kickstart production
Fishing Operations Retrieve lost tools or debris from the wellbore
Milling & Drilling Operations Remove plugs, packers, or cement with automated drilling modes
Bridge Plug Milling Efficient plug removal in deep wells
Velocity String Installation Run smaller-diameter tubing to address liquid loading
Underbalanced Operations Maintain pressure while drilling

Product Type Configurations

Configuration Best For Key Advantage
Trailer-Mounted Integrated (SLG630T) Deep/ultra-deep wells requiring maximum tubing capacity Large-capacity reel; road-towable
Truck-Mounted SLG630 Operations requiring all-in-one mobility on unpaved roads 36-ton tubing transport capacity on unpaved roads
All-Electric SLG630D Green, low-carbon operations 30% lower energy cost; 10% noise reduction
Skid-Mounted SLG630 Offshore platforms; permanent installations Maximum stability; crane-in/crane-out simplicity

OEM Customization Solutions

The SLG630T is not a one-size-fits-all product – it’s a platform that we adapt to your specific operational requirements. SJ offers customized coiled tubing units tailored to your needs, with multiple configurations including truck-mounted, trailer-mounted, skid-mounted, and combination configurations.

What we customize:

  • Tubing capacity – From 2″ × 8,000 m to 2-3/8″ × 7,000 m and beyond

  • Tubing diameter – From 3/8″ up to 4-1/2″

  • Power system – Diesel-hydraulic or all-electric drive

  • Control system upgrades – "One-key” automation, data acquisition, remote monitoring

  • Climate adaptation – Cold-weather packages; high-temperature cooling

  • BOP stack – Pressure rating and size per your well control requirements

  • Fleet branding – Your company colors and logos applied before delivery

  • Downhole tool packages – Fishing tools, milling assemblies, logging adapters

  • Well control equipment – Personalized per customer requirements

Why Choose SJ Petroleum Machinery?

🏭 Sinopec Manufacturing Heritage

We're not a trading company – we’re a manufacturer with roots in Sinopec's engineering ecosystem. Founded in 1941, we’ve been building oilfield equipment for over eight decades. As a China Critical Technological Equipment Nationalization Base and National Hi-tech Enterprise, our quality systems, supply chains, and engineering standards meet the highest benchmarks.

🔧 Full-Spectrum Engineering Capability – 100% Independent

From injector head to control cabin, we design and build every major component in-house. We have mastered heavy-load injector heads, large-capacity quick-change reels, automated control systems, and integrated modular designs. The SLG630D has been recognized as the world's first all-electric drive automated coiled tubing unit.

🎯 Automation Pioneer – China’s First "One-Key” CTU

We developed "一键式” ("one-key”) automation for coiled tubing units, achieving automatic pipe running and retrieval, automatic pipe spooling, and automatic lubrication with a 30% efficiency improvement. The system features three automatic drilling modes that reduce drilling time by 50%.

🌍 Proven Global Track Record

After nearly 20 years of continuous development, SJ's coiled tubing units have been exported to the Middle East, South America, Africa, Russia, and other international markets. The SLG630 has been field-proven in the Puguang Gas Field at 6,121 meters and has successfully completed side-tracking horizontal well operations.

⚡ Field-Proven Performance – The Largest in Domestic Use

The SLG630 is currently the largest-capacity coiled tubing unit in domestic use in China, with a maximum pulling force of 62 tonnes and maximum tubing capacity of 2″ × 8,000 meters. The SLG630D (all-electric) offers 30% lower energy cost and 10% noise reduction compared to diesel-hydraulic equivalents.

📋 Certified to International Standards

API Q1, ISO 9001, and HSE management system certified. Our manufacturing processes are audited annually.

🔄 One-Stop Service Commitment

Commissioning support, operator training, spare parts logistics, and technical troubleshooting – we stay with you after the sale. Our export team understands the logistics of international shipping and can arrange delivery to your location.

💰 Competitive Pricing, No Quality Compromise

Chinese manufacturing doesn't mean cutting corners. We deliver professional-grade coiled tubing equipment at prices that make sense for your capital budget – full transparency on materials, components, and workmanship.

Frequently Asked Questions (FAQ)

Q1: What’s the pulling capacity of the SLG630T?

A: The SLG630T delivers 620 kN (62 tonnes / 140,000 lbs) of continuous pulling force. This is the highest-capacity coiled tubing unit in the SLG series and the largest-capacity unit in domestic use in China.

Q2: What tubing capacity does the SLG630T handle?

A: The SLG630T is equipped with a large-capacity tubing reel that holds 2″ tubing to 8,000 meters. For long horizontal wells and high-flow-rate operations, the unit can be configured with 2-3/8″ tubing to 7,000 meters.

Q3: What tubing diameters does the SLG630T handle?

A: The SLG series handles tubing from 3/8″ up to 4-1/2″. The SLG630T is optimized for 2″ to 2-3/8″ operations, with customization available for other diameters.

Q4: Does the SLG630T support automation?

A: Yes. The SLG630T supports "一键式” ("one-key”) automation with three automatic drilling modes that reduce drilling time from 2–4 hours to 0.5–1 hour – a 50% efficiency improvement. The system also features adaptive control pressure adjustment that intelligently identifies and intervenes in slip drilling situations, enhancing operational safety.

Q5: Has the SLG630T been proven in the field?

A: Yes. The SLG630 has been field-proven in the Puguang Gas Field at 6,121 meters and has successfully completed side-tracking horizontal well operations. In the Shengli Oilfield, SLG630 equipment has demonstrated cumulative operation mileage reaching millions of meters.

Q6: Is an all-electric version available?

A: Yes. SJ has developed the SLG630D all-electric drive automated coiled tubing unit, recognized as the world's first of its kind. The electric version offers 30% lower energy cost and 10% noise reduction compared to diesel-hydraulic equivalents.

Q7: What’s the typical lead time for an SLG630T?

A: Standard lead time is 120 to 180 days from order confirmation to shipment, depending on configuration and customization level. Contact our sales team for current availability.

Q8: Do you provide training and after-sales support?

A: Absolutely. Each SLG630T sale includes commissioning assistance and operator/maintainer training – either at your facility or ours. Spare parts are stocked for global shipment, and our technicians are available for field support.

Q9: Where has the SLG630 been exported?

A: SLG series coiled tubing units have been exported to the Middle East, South America, Africa, Russia, and other international markets. The SLG630 has been deployed in Saudi Arabia and Africa.

Q10: How do I get a quote for an SLG630T?

A: Send us your well parameters: target depth, tubing diameter, expected wellhead pressure, operating environment, and preferred configuration. We'll respond with a technical proposal and commercial quote within 7–10 business days.

Tag: Digital & Intelligent Coal Bed Methane Drilling Rig | Intelligent CBM drilling rig | Smart drilling system | Digital drilling rig | CBM drilling solutions | Automated oil drilling rig | Automated drilling system | Automated Drilling Rig | Automated drilling technology | Automated drilling solutions | Heavy duty drilling and completion tools | Drilling and completion solutions | Drilling and completion specifications | Diamond drill bit | Iron roughneck parts | PDC drill bit price | Tricone drill bit | Drill pipe joints | Directional drilling tools | Drill bit selection guide | Drill bit supplier

(0/10)

clearall