Product Categories

marine supporting facilities

Technical Specifications (Representative Range)

Equipment Category Model / Type Key Specs Platform Fit
Diesel Generator Set SJ‑GENSET‑500 500 kVA, 690V, 50/60Hz, marine muffler Skid‑mounted, 12t
Chemical Injection Skid SJ‑CHEM‑6 6 injection points, 0–500 L/hr each, 100 bar Stainless steel frame, 3.5t
Sewage Treatment Plant SJ‑STP‑50 50 m³/day, MEPC compliant Modular, 5t
Fire Fighting Skid (Deluge) SJ‑FIRE‑2000 2,000 m³/hr seawater pump, AFFF tank Containerized, 8t
Pedestal Crane SJ‑CRANE‑20T 20t SWL @ 15m, hydraulic, full slew Pedestal mount, self‑contained
BOP Handling Trolley SJ‑BOP‑50 50t capacity, pneumatic/chain drive Skid‑mounted, 4t
Freshwater Maker (RO) SJ‑RO‑20 20 m³/day, 500 ppm TDS max Skid‑mounted, 2.5t
Living Module (4‑person) SJ‑LQ‑4 A60, 3.0m x 6.0m x 2.8m, 4 bunks + washroom Containerized, 6t
HVAC Air Handling Unit SJ‑HVAC‑20 20 kW cooling, positive pressure, Ex‑d Skid‑mounted, 1.5t
Compressed Air Skid SJ‑AIR‑50 50 m³/hr, 10 bar, air receiver 500L Skid‑mounted, 1.8t



How Marine Supporting Facilities Are Deployed

Platform Type Typical Supporting Facilities Required
Fixed Production Platform Power generation, water treatment, sewage plant, accommodation, HVAC, fire system, crane
Drilling Platform (with Rig) BOP handling, mud/cement mixing, slop water treatment, workshop, compressed air
Satellite Wellhead Platform Small diesel genset, chemical injection, basic sewage treatment, davit crane
FPSO / Floating Production All of the above (larger scale) plus offloading systems and ballast control
Accommodation / Utility Platform Living quarters, galley, laundry, freshwater maker, power, sewage treatment, HVAC

OEM Customized Solutions – Designed for Your Platform, Not a Catalog

Marine supporting facilities are never one‑size‑fits‑all. Your platform may have space constraints, crane limitations, power availability differences, or specific environmental compliance targets. We treat every project as a custom engineering engagement.

What we customize:

Your Constraint Our Customization
Limited deck space Vertical stacking of modules (e.g., water treatment under workshop) or compact footprint designs
Low crane capacity Split single skids into multiple 5‑8t modules for easy lifting
No dedicated power supply Diesel generator skid with day tank – self‑contained
Harsh environment (H₂S, high humidity) TSA coating, 316L stainless steel wetted parts, explosion‑proof everything
Cold climate operation Arctic‑grade insulation, heated enclosures, low‑temperature hydraulics
Remote monitoring requirement 4G/5G telemetry system – we’ve done up to 50km from shore
Specific discharge limits Customized treatment trains (ultrafiltration, reverse osmosis, evaporation)
Multi‑platform deployment Interchangeable module designs with standardized quick‑connect interfaces

Our engineering process for marine supporting facilities:

  1. Discovery: You send platform layout, weight budgets, power availability, environmental targets, and headcount.

  2. Engineering study: Within 3 weeks, our multi‑disciplinary team (mechanical, electrical, civil, process) produces a facility layout, weight report, and single‑line diagrams.

  3. 3D model review: Shared online for your platform integration team.

  4. Fabrication in ISO‑9001 facility: All skids pressure‑tested and function‑tested.

  5. Pre‑commissioning: Full system test at our yard – you witness.

  6. Shipping & offshore installation: Our field engineers supervise placement, hook‑up, and commissioning.

Why Choose SJ Petroleum Machinery for Marine Supporting Facilities?

Reason What You Actually Gain
Complete systems under one roof From power generation to sewage treatment, from cranes to living quarters – one supplier, one warranty, one point of responsibility.
Sinopec Group engineering depth Core equipment manufacturing enterprise of China Petrochemical Corporation. Access to group‑wide resources and field validation.
200+ product types in four major categories We don't outsource critical components. All major skids and systems are designed and fabricated in‑house.
API and marine classification certified API, ISO 9001, and certifications from DNV, ABS, CCS available per project requirement.
Modular by default Every facility we build is designed for skid‑mounted or containerized deployment – easier installation, easier relocation.
Field service from multi‑disciplinary engineers Our support team includes electrical, mechanical, and process engineers who have commissioned these systems on live platforms.
Global delivery track record Supporting facilities supplied to platforms across China’s offshore fields, Middle East, Southeast Asia, and Africa.

Frequently Asked Questions (FAQ)

Q1: What exactly is included in "marine supporting facilities”?

A: These are all the auxiliary systems on an offshore platform that are not directly part of drilling or production equipment. Typical inclusions: power generation, water treatment (freshwater, produced water, slop water), sewage treatment, fire fighting systems, gas detection, deck machinery (cranes, winches, BOP handling), accommodation modules, HVAC, workshops, compressed air, and chemical injection skids.

Q2: Can SJ supply a complete support facilities package for a new platform?

A: Yes – this is one of our core strengths. We supply integrated facilities packages for entire offshore platforms. You provide the platform layout and operational requirements; we provide the detailed engineering, fabrication, and on‑site installation support.

Q3: What certifications do your marine supporting facilities carry?

A: All pressure‑containing components are API or ASME certified. For classification society requirements (DNV, ABS, BV, CCS), we can provide certification per your project spec – additional lead time applies.

Q4: How do you handle corrosive marine environments?

A: Standard: C5‑M marine coating (tested to 3,000+ hours salt spray), stainless steel fasteners, IP56 electrical enclosures. Upgrade options: thermal spray aluminum (TSA) coating, 316L stainless steel wetted parts, and full marine grade aluminum for helidecks and living modules.

Q5: What is the typical lead time for a supporting facilities package?

A: Depends on package size and complexity. Small packages (e.g., chemical injection + water treatment + sewage): 4‑6 months. Medium packages (add power generation + deck crane): 6‑8 months. Full platform support facilities (all systems): 8‑12 months. Rush options available.

Q6: Do you provide offshore installation and commissioning?

A: Yes – every major facilities order includes on‑site supervision of placement, hook‑up, and system commissioning. Typical on‑site duration: 2‑6 weeks depending on package size. We also provide remote commissioning via video link for simpler systems.

Q7: What training do you provide for platform crews?

A: Standard: 1‑2 weeks on‑site training covering operation, daily checks, and troubleshooting of each system – power, water treatment, crane, fire system, HVAC, etc. We supply laminated quick reference cards and full PDF manuals.

Q8: What warranty applies to marine supporting facilities?

A: 18 months from shipment or 12 months from commissioning. Major mechanical components have 24‑month warranty. Extended warranty options available.

Q9: Can existing platforms add these facilities (retrofits)?

A: Yes – we specialize in retrofits. Because our systems are modular and skid‑mounted, they can be lifted onto existing decks with platform cranes. We conduct a detailed deck load study and integration engineering before fabrication.

Tag:

(0/10)

clearall