Products

Home / Products / Vertical Lifting Drilling Rig

Product Categories

Vertical Lifting Drilling Rig

Technical Specifications

Below are representative specifications for standard vertical lifting drilling rig models. Custom configurations are available for specific depth and mobility requirements.

General Specifications

Parameter SJ‑V30 SJ‑V50 SJ‑V80
Nominal drilling depth (m) 300 – 1,000 800 – 2,000 1,500 – 3,000
Hook load capacity (kN) 300 500 800
Mast height (m) 12 – 15 15 – 18 18 – 24
Mast sections 2 (telescopic) 2 – 3 (telescopic) 3 (telescopic)
Rotary drive type Spindle / top drive Top drive / rotary table Top drive / rotary table
Mast raising system Dual hydraulic cylinders Dual hydraulic cylinders Dual hydraulic cylinders
Outriggers 4 (hydraulic) 4 (hydraulic) 4 – 6 (hydraulic)
Mobility Truck / trailer Truck / trailer Truck / trailer / crawler


Drive & Power

Parameter Mechanical Version Hydraulic Version
Engine power (kW/HP) 150 – 300 (200 – 400) 150 – 300 (200 – 400)
Drawworks drive Clutch / gearbox Variable displacement pump + motor
Rotary torque (Nm) 4,000 – 12,000 6,000 – 20,000
Rotary speed (RPM) 0 – 300 (3‑speed) 0 – 400 (infinitely variable)
Mud pump drive Independent engine or PTO Independent engine or PTO
Control system Manual lever Proportional joystick + HMI

Physical & Transport

Parameter Truck‑Mounted Trailer‑Mounted Crawler‑Mounted
Transport length (m) 10 – 14 8 – 12 6 – 9
Transport width (m) 2.5 – 2.8 2.3 – 2.6 2.2 – 2.8
Transport height (m) 3.8 – 4.2 3.0 – 3.5 2.8 – 3.2
Gross weight (tonnes) 20 – 35 15 – 25 18 – 28
Road‑legal in most countries Yes (≤ 2.55m width, ≤ 4.0m height) Yes Transport on low‑boy trailer

Certifications

Certification Availability
API 4F (mast and substructure) Standard
API 8C (top drive / hoisting) Standard
API 7K (drawworks) Standard
ISO 9001, ISO 14001, ISO 45001 Standard
CE marking Available on request
GOST / EAC (Russia / CIS) Available on request

Product Types – Vertical Lifting Drilling Rigs by Configuration

Configuration Typical Depth Key Features Best For
Truck‑Mounted (2‑axle) 300 – 1,500 m Single cab‑over chassis, rear outriggers, mast pivots from rear Urban water wells, exploration, workover in accessible locations
Truck‑Mounted (3‑axle) 1,000 – 3,000 m Heavy‑duty chassis, longer mast (18‑24 m), front and rear stabilizers, larger mud pump capacity Deep water wells, geothermal, mineral exploration, heavy workover
Trailer‑Mounted 300 – 2,000 m Towed by standard road tractor, lower transport height, independent hydraulic power unit Remote area drilling, rental fleets, operations where vehicle ownership isn't desired
Crawler‑Mounted 100 – 800 m Self‑propelled steel tracks, low ground pressure, articulated mast for angled drilling Mountainous terrain, swampy ground, underground mining, slope drilling (up to 45°)
Underground / Mine 50 – 300 m Extreme narrow width (950 mm – 1,200 mm), low height, flame‑proof electricals, dust suppression Coal seam degassing, exploration drifts, tunnel grouting
Containerized Module 300 – 1,500 m Mast and drive system housed in ISO container, helicopter‑transportable components Fly‑in fly‑out exploration, arctic operations, offshore platform retrofits

Special purpose variants:

  • Workover rig – optimized for pulling and running production tubing, with faster hoisting speeds

  • Water well drilling rig – larger diameter capability, mud pump optimized for high flow rates

  • Geothermal drilling rig – corrosion‑resistant components, high‑temperature mud system

  • Rescue / emergency drilling rig – ultra‑fast setup, integrated communication and lighting

Applications – Where Vertical Lifting Drilling Rig Adds Value

Application Why Choose a Vertical Lifting Rig Typical Depth
Water well drilling Drives to the village, sets up in a narrow street, drills 100‑400mm diameter boreholes. Minimal site preparation required. 50 – 500 m
Geothermal boreholes Urban backyards and parking lots have limited access. The vertical mast fits where a crane cannot. 50 – 300 m
Mine exploration & degassing Narrow tunnels (1.4m – 2.5m wide) require compact equipment. Underground version fits through standard mining drifts. 50 – 600 m
Workover & well service On a crowded well pad, space between wellheads is tight. The rig moves between wells without full disassembly. 500 – 3,000 m
Mineral exploration Remote mountain roads limit truck lengths. The trailer‑mounted version is towed by a standard 4×4 pickup. 100 – 800 m
Emergency rescue / relief After a landslide or flood, roads are blocked. The rig must be air‑transportable or towable by light vehicles. 50 – 300 m
Offshore platform maintenance Deck space is limited. The vertical lift mast deploys without swinging into adjacent equipment. 500 – 2,000 m
Coalbed methane / coal gas Access roads to remote wellheads are unpaved. The crawler‑mounted version travels where trucks cannot. 200 – 1,000 m

Based on data from the National Mine Rescue Team of Shandong, specialized dual‑powerhead vehicle‑mounted drilling rigs have achieved hoisting capacity of 1350 kN and a total footage exceeding 10,000 meters, effectively meeting the demands of emergency rescue drilling in coal mine disasters. This demonstrates that vertical lifting drilling rigs are not just convenient – they are essential for critical missions where every minute counts.

Why Choose SJ Petro for Your Vertical Lifting Drilling Rig?

1. Over 80 Years of Manufacturing Heritage

SJ Petro was founded in 1941 and has been part of Sinopec Group since 2013. With eight decades of experience in petroleum machinery, we have developed a deep understanding of what makes a drill rig reliable, maintainable, and productive. Our products include drilling rigs, workover equipment, fracturing units, cementing units, and offshore equipment – more than 200 models across 12 series.

2. Designed for Rapid Movement and Quick Setup

Our vertical lifting drilling rigs are part of our broader commitment to fast‑mobilization drilling technology – a concept our group pioneered internationally. Every component is designed to minimize setup time: pinned connections instead of bolted, pre‑connected hydraulic hoses with quick couplers, and color‑coded electrical plugs. A well‑trained crew can have the rig drilling within 30 minutes of arrival.

3. API Certified – No Compromises on Quality

Our drilling rigs, workover equipment, and components are manufactured to API 4F, API 7K, and API 8C specifications. We maintain ISO 9001, ISO 14001, and ISO 45001 certifications. Every mast undergoes finite element analysis and stress inspection testing before leaving the factory.

4. Robust After‑Sales Network

SJ Petro products are operating in major oil and gas producing regions worldwide. Our service network includes:

  • Regional support hubs with local parts inventory

  • 24/7 remote diagnostics – our engineers can log into the control system (with your permission) to troubleshoot

  • On‑site training for your operators and maintenance crews

  • Preventive maintenance schedules tailored to your operating hours

5. Flexible Commercial Options

We understand that capital budgets vary. Our vertical lifting drilling rigs are available through:

  • Direct purchase – standard payment terms (30/40/30)

  • Operating lease – monthly payments for 12‑60 months, ideal for short‑term campaigns

  • Lease‑to‑own – after 24‑36 months, ownership transfers

  • Rental – short‑term rental for single projects

  • Used / refurbished units – fully inspected and warrantied, at reduced cost

6. Customization – Your Rig, Your Way

No two drilling operations are identical. We customize every vertical lifting drilling rig for:

  • Your target depth – mast height and hoisting capacity matched to your well design

  • Your terrain – tire selection, chassis reinforcement, track type

  • Your climate – arctic insulation, desert cooling, tropical coatings

  • Your power preference – diesel, electric, or hybrid

  • Your control preference – manual levers, joystick + HMI, or full remote operation

7. Low‑Total‑Cost‑of‑Ownership Design

Our engineering team focuses on three metrics that matter most to operators:

  • Uptime – robust, field‑proven components with long service intervals

  • Spare parts availability – common parts across models reduce inventory

  • Maintenance simplicity – grease points accessible, hydraulic lines color‑coded, schematics laminated and mounted

FAQ – Vertical Lifting Drilling Rig

Q1: What is the difference between a vertical lifting drilling rig and a conventional land rig?

A: A conventional land rig uses a crane or drawworks to erect a large mast that pivots from a horizontal to vertical position. This requires significant swing clearance. A vertical lifting drilling rig uses hydraulic cylinders to lift the mast straight up from a compact base – no swing clearance needed. It is also typically self‑propelled (truck or crawler), whereas conventional rigs are transported in multiple modules.

Q2: How deep can a vertical lifting drilling rig drill?

A: Our standard models are designed for depths of 300 to 3,000 meters, depending on model configuration. The SJ‑V80 model (3‑section telescopic mast, 800 kN hook load) is capable of drilling down to 3,000 meters in suitable formations. For deeper applications (4,000m+), we recommend our modular drilling rig series.

Q3: Can I use the rig for both vertical and angled drilling?

A: Yes. While the primary mast orientation is vertical, the rig can be configured for angled drilling up to 45° using an articulated mast head or by tilting the entire substructure with adjustable outriggers. The underground mining version offers ±45° angle capability. For dedicated horizontal drilling, we offer separate coiled tubing units.

Q4: How long does it take to set up the rig at a new location?

A: With a trained crew of 2‑3 people, the truck‑mounted version can be set up and ready to drill in 15‑30 minutes. The sequence: deploy outriggers, level the chassis, raise the mast to vertical, extend telescopic sections (if fitted), connect mud hoses, and start the circulating system. The crawler‑mounted version may take slightly longer due to manual track leveling.

Q5: What kind of maintenance does the hydraulic mast require?

A: The hydraulic lifting cylinders require grease of the pivot points every 50 operating hours and hydraulic oil level checks every 250 hours. The cylinder rod seals should be inspected every 500 hours for signs of leakage or scoring. We provide a laminated maintenance checklist with every rig.

Q6: Can the rig be operated by a two‑person crew?

A: Yes. With the semi‑automated control system (optional), one operator at the console can handle all drilling functions while a second crew member manages mud systems, casing, and downhole tools. Basic manual models may require three crew members for efficient operation.

Q7: Do you offer training?

A: Yes. Every rig purchase includes 5 days of on‑site training covering: setup and teardown, safe operation of the hydraulic mast, maintenance procedures, and emergency response. For international customers, we can train your crew at our factory before shipment.

Q8: What is the delivery lead time?

A: Standard truck‑mounted models (SJ‑V30, SJ‑V50) are available in 90‑120 days from order. Custom configurations (depth extensions, special coatings, arctic packages) typically require 120‑150 days. Crawler‑mounted and underground versions take 150‑180 days.

Q9: Can you supply a complete package including mud pump, drill pipe, and downhole tools?

A: Absolutely. We are a one‑stop manufacturer of drilling equipment. We can supply:

  • Mud pumps (triplex, up to 1,600 HP)

  • Drill pipe (2‑3/8″ to 5‑1/2″, API grade E to S)

  • Downhole tools (stabilizers, reamers, subs, fishing tools)

  • Solids control equipment (shakers, desanders, centrifuges)

  • Casing and tubing (from 4‑1/2″ to 13‑3/8″)

All components are pre‑tested together before shipment.

Q10: Do you offer financing?

A: Yes. Through Sinopec's financial partners, we offer:

  • Operating lease (12‑60 months) – equipment rental with maintenance included

  • Finance lease – ownership transfers at end of term

  • Bank financing support – we assist with documentation for your preferred lender

(0/10)

clearall