Offshore equipment maintenance
Technical Scope – Offshore Equipment Maintenance Services
We maintain the following offshore equipment categories. All work follows OEM procedures and class society (ABS, DNV, BV) requirements when applicable.
| Equipment Category | Typical Maintenance Tasks | Common Spares | Certifications Held |
|---|---|---|---|
| BOP stack (ram & annular) | Function test, pressure test (low & high), seal replacement, ram change | Seals, bonnet bolts, indicator switches | API 16A, ABS, DNV |
| BOP control unit (hydraulic & electric) | Accumulator pre‑charge check, solenoid valve test, filter change | Solenoid coils, seals, pressure switches | API 16D |
| Wellhead & Christmas tree | Grease injection, torque check on flange bolts, seal inspection, valve operation | Seal rings, stem packing, grease fittings | API 6A, PR2 |
| Hydraulic workover unit | Cylinder seal inspection, hose replacement, load cell calibration | Cylinder seal kits, hoses, valve cartridges | API 8C, ATEX |
| Top drive | Gearbox oil analysis, IBOP function test, electrical connection check | IBOP seals, motor brushes, sensors | API 7K, 8C |
| Mud pumps (triplex) | Liner & piston replacement, valve seat inspection, pulsation dampener pre‑charge | Liners, pistons, valves, seats, packing | API 7K |
| Drawworks & brake system | Brake pad measurement, drum wear inspection, gearbox oil change | Brake pads, seals, filters | API 7K, 8C |
| Hydraulic power units | Oil analysis, filter change, pump coupling check, relief valve test | Filters, seals, hoses, pump cartridge | ATEX, ISO |
| Choke & kill manifold | Valve stroke test, pressure test, actuator lubrication | Gate valve seats, stem seals | API 6A, 16C |
| Platform cranes (pedestal) | Wire rope inspection, brake adjustment, hydraulic system check | Brake pads, wire rope, hydraulic seals | API 2C (on request) |
Service Types – Offshore Equipment Maintenance Programs
We offer several offshore equipment maintenance service levels to match your operational criticality and budget:
-
Annual Class‑Required Inspection – Basic visual inspection, function test, pressure test (if required), and certification. Minimal downtime (1‑2 days). Suitable for wellhead and BOP regulatory compliance.
-
Scheduled Preventive Maintenance (PM) – Quarterly or semiannual visits lasting 3‑7 days. Full inspection, replacement of wear parts, lubrication, calibration, and oil sampling. Includes a written report with recommendations.
-
Condition‑Based Maintenance (CBM) – We install remote monitoring sensors. Our shore‑based engineer reviews data weekly and recommends maintenance only when thresholds are exceeded. Reduces unnecessary offshore visits.
-
Emergency Breakdown Service – Call‑out within 48 hours. Technician brings a pre‑packed spares kit. Hourly rate applies after the first 8 hours. Includes weekend and holiday response.
-
Full‑Scope Maintenance Contract – Our team takes full responsibility for all preventive and corrective maintenance for a fixed monthly fee or cost‑per‑operating‑hour. Includes spare parts, technician travel, and remote monitoring. Guaranteed uptime.
-
Component Exchange Program – For high‑failure items (BOP rams, actuators, hydraulic cylinders). We stock refurbished units. Swap on site; we refurbish your core in our onshore workshop.
-
Shore‑Based Overhaul – Send your BOP stack, wellhead, or hydraulic cylinder to our ISO‑certified workshop. We completely disassemble, inspect, replace worn parts, pressure test, recertify, and return. Lead time: 4‑8 weeks.
Applications – Where Our Offshore Equipment Maintenance Is Used
We provide offshore equipment maintenance for:
-
Fixed production platforms – South China Sea, Middle East Gulf. Annual wellhead & tree maintenance, valve greasing, and BOP function tests.
-
Jackup drilling rigs – Routine PM on drawworks, mud pumps, top drive, and BOP during rig moves or between wells.
-
Semi‑submersibles & drillships – Heave‑compensated system maintenance, subsea BOP control system checks, and thruster hydraulic unit service.
-
FPSO topsides – Production tree maintenance, chemical injection pump overhaul, and emergency shutdown system testing.
-
Offshore workover units – Hydraulic cylinder seal replacement, hose condition monitoring, and load cell recalibration.
-
Platform cranes – Annual wire rope inspection, brake adjustment, and load test (if required by class).
Why Choose SJ Petro for Offshore Equipment Maintenance?
-
OEM of much of the equipment – We built the rigs, workover units, and wellheads we maintain. We have the original engineering data – not guesswork.
-
Offshore‑certified technicians – All our field service engineers hold BOSIET (Basic Offshore Safety Induction & Emergency Training), HUET (Helicopter Underwater Escape Training), and CA‑EBS (Compressed Air Emergency Breathing System). They have valid medicals and are vaccinated for offshore locations.
-
Global logistics network – We pre‑position common spare parts in Singapore, Dubai, and (for Americas) Houston agent. Fastest airfreight to most offshore hubs: 24‑48 hours.
-
Class society approved – Our maintenance procedures and workshop are approved by ABS, DNV, BV, and CCS for certain equipment categories. We can also work with other societies on request.
-
Digital reporting & traceability – Every maintenance action is logged with photos, torque values, and test curves. You get a searchable digital archive. This greatly simplifies regulatory audits.
-
24/7 support hotline – A real engineer answers, not a call center. We can often diagnose issues remotely via video call, saving an unnecessary trip.
-
Exchange program reduces downtime – Instead of waiting 4‑6 weeks for BOP ram refurbishment, we swap it offshore in 2 hours. Your core is returned later.
-
Competitive daily rates – Because we are an OEM, our callout rates are 15‑20% below independent service companies. And we never charge for "engineering time” to read our own drawings.
-
Warranty on work – 12 months on labor and replaced parts (consumables excluded). If a repair fails during that period, we return at no charge.
Frequently Asked Questions (FAQ)
Q1: Do you have technicians stationed in my region?
We have full‑time technicians based in China (Guangzhou & Shenzhen), Singapore, and UAE (Dubai). For other regions, we fly technicians from the nearest hub. For large contracts (e.g., fleet maintenance in West Africa or Brazil), we will station a technician locally.
Q2: What is your typical response time for an emergency callout?
From the time you call the hotline: 24 hours to mobilize from our hub, plus travel time to the heliport/boat. For platforms near Singapore or Dubai, total time to arrival is often under 48 hours. For remote locations (e.g., Falklands, Arctic), 72‑96 hours. We can also ship urgent spare parts ahead of the technician.
Q3: Can you perform maintenance on equipment you did not manufacture?
Yes – we maintain third‑party BOPs (Cameron, NOV, Shaffer), wellheads (FMC, GE), and top drives (Canrig, Varco). We maintain a library of maintenance manuals and part cross‑references. For unusual equipment, we may ask for a pre‑visit survey to identify spare parts needs.
Q4: How do you handle hot work permits on an active platform?
We strictly follow the platform operator’s permit‑to‑work system. We will assign a dedicated safety observer, bring fire‑resistant blankets, and use intrinsically safe tools where required. Many maintenance tasks (seal replacement, valve greasing) do not require hot work. Welding or grinding is planned during platform shutdowns if possible.
Q5: What is the cost of an annual offshore equipment maintenance contract?
It depends on the equipment count, location, and desired service level. For a typical fixed platform with one wellhead tree, one BOP stack, and one hydraulic power unit, an annual PM contract (two visits) ranges from 25,000to25,000to45,000, excluding parts. A full‑scope contract including parts and emergency response is around 80,000‑80,000‑120,000 per year. Request a custom quote.
Q6: Do you provide load testing and recertification for platform cranes?
Yes – we have qualified crane inspectors who can perform visual inspection, NDE (magnetic particle, ultrasonic), and load testing using calibrated weights or dynamometers. We provide a certificate acceptable to ABS/DNV for crane recertification.
Q7: Can you train my offshore maintenance crew to do basic repairs themselves?
Absolutely. We offer a 3‑day "Offshore Equipment Maintenance” course on the platform, covering: daily inspection checklists, seal replacement on valves, adjusting BOP control pod pressures, and troubleshooting hydraulic leaks. We also provide a laminated quick‑reference card for your crew.
Q8: What documentation do you provide after a maintenance visit?
You receive a digital package within 24 hours: service report (summary), detailed checklist with measurements (torque, pressure, gaps), photos of any wear or corrosion, list of parts replaced, recommendations for future work, and test certificates (if pressure tests were performed).
Q9: Do you have spare parts on consignment at major offshore hubs?
Yes – we maintain consignment stocks in Singapore and Dubai for fast‑moving items: BOP seal kits (all sizes), gate valve stem packing, hydraulic hoses (common lengths), and control pod solenoid valves. You pay only when you use the part.
Q10: How do I schedule an offshore equipment maintenance visit or request an emergency callout?
Email offshore‑service@sjpetro.com for non‑urgent scheduling. For emergencies, call our 24/7 hotline +86 416 1234 5678 (simulated – actual number provided with contract). Provide:
-
Platform name and location
-
Equipment type and model
-
Nature of problem (e.g., "BOP annular seal leaking,” "top drive hydraulic fault”)
-
Any spare parts already on hand
We will respond within 1 hour with an estimated response time and cost.















