Products

Home / Products / Fast installation drilling rig

Product Categories

Fast installation drilling rig

Technical Specifications – Fast Installation Drilling Rig

The table below shows a representative 5,000m fast installation rig. Custom configurations for shallower or deeper depths available.

Parameter Specification
Rig model SJ‑FIR‑5000
Nominal depth (4‑1/2″ DP) 5,000 m (16,400 ft)
Hook load 500,000 lbs (2,225 kN)
Mast type K‑shaped, 2‑stage telescoping, self‑erecting
Mast extended height 140 ft (43 m)
Mast raising time 30 minutes
Substructure type Parallelogram, low‑position assembly
Substructure height 7.5 m (25 ft)
Number of modules 48
Max module weight 18,000 kg (40,000 lbs)
Drawworks power 1,500 HP AC‑VFD
Top drive 50,000 ft‑lbs continuous torque
Mud pumps 2 × 1,600 HP triplex
Walking/skidding system Optional (hydraulic)
Rig‑up time (first pad) 48 hours
Rig‑down + move time (to next pad) 24 hours
Inter‑well move time (with walking) 2‑6 hours
Crew size (rig‑up) 4‑6
Crew size (drilling) 6‑8
Certifications API 4F, 7K, 8C
Lead time (FOB China) 8‑12 months


Applications

Application Why Fast Installation Rig Is Critical
Multi‑well shale pads 10‑40 wells per pad; walking between wells saves days per move
Remote land exploration No crane support available; rig must self‑erect
Tight gas / CBM fields Hundreds of shallow wells; rapid pad‑to‑pad moves essential
Urban drilling (space‑constrained) Small footprint, crane‑free assembly fits in tight sites
Disaster relief wells Deploy within 48 hours of arrival on site
Workover campaigns Move between wells in hours, not days
International development projects Standard container shipping; local cranes not always available

Product Types – Fast Installation Rig Configurations

Model Depth Rating Hook Load Modules Best For
SJ‑FIR‑3000 3,000 m 300,000 lbs 32 Shallow gas, CBM, workover
SJ‑FIR‑5000 5,000 m 500,000 lbs 48 Standard land drilling
SJ‑FIR‑7000 7,000 m 700,000 lbs 64 Deep wells, HPHT
SJ‑FIR‑M (mobile) 3,000‑5,000 m 500,000 lbs Self‑propelled No truck needed – integrated carrier

Why Choose SJ Petro Fast Installation Drilling Rigs?

1. Crane‑Free Rig‑Up – Our self‑erecting mast and pin‑together modules eliminate the need for auxiliary cranes. Set up anywhere, even where crane access is impossible.

2. 70% Reduction in NPT – Industry data shows rapid rig technology reduces move time from 7‑10 days to 24‑48 hours. For a 10‑well pad, that saves over 2 months of rig time.

3. Ground‑Level Assembly – The parallelogram substructure is pinned together at ground level, then raised hydraulically. No working at height during rig‑up – safer for crews.

4. Fewer Modules, Faster Connections – 40‑60 modules (vs 100+ for conventional rigs). Pre‑labeled hoses and cables connect in minutes.

5. Field‑Proven – Our fast installation rigs have drilled over 500 wells in China, Middle East, and South America. Moving between pads in under 48 hours is routine.

6. API 4F & 7K Certified – Not "designed to” – fully certified. Full material traceability and load testing.

7. Global Logistics – All modules fit within standard 40ft containers or flat racks. We have shipped fast installation rigs to six continents.

8. Sinopec Engineering – Backed by decades of drilling experience. Our fast installation design is not a prototype – it is production‑proven.

Frequently Asked Questions (FAQ)

Q1: What is the difference between a fast installation drilling rig and a conventional rig?
Conventional rigs require cranes, bolted connections, and 7‑10 days for rig‑up. Fast installation rigs use pin‑together modules, self‑erecting hydraulics, and can be ready to drill in 24‑48 hours.

Q2: How many people are needed to rig up the fast installation rig?
4‑6 experienced rig hands can complete rig‑up in 48 hours. Conventional rigs require 12‑16 people for the same task.

Q3: Do I need a crane to assemble the rig?
No. The mast is self‑erecting – hydraulic cylinders raise it from horizontal to vertical. The substructure is raised hydraulically. All modules are designed to be pinned together with hand tools.

Q4: Can the rig move between wells on the same pad without rig‑down?
Yes – with the optional hydraulic walking or skidding system, the assembled rig (mast vertical, utilities connected) can move to the next well in 2‑8 hours.

Q5: What is the maximum rig‑up height for module connections?
All pin connections are made at ground level on the low‑position substructure. No working at height during assembly. The cabin and BOP are raised with the substructure.

Q6: How does the mast raising system work?
The mast is attached to the substructure in the horizontal position using pivot pins. Dual hydraulic cylinders then raise it to vertical, where automatic locking pins engage.

Q7: Can the rig be shipped in standard containers?
Yes – each module fits within standard 40ft container dimensions. We provide a detailed packing list for customs clearance and transport planning.

Q8: What is the typical lead time for a fast installation drilling rig?
8‑12 months FOB China, depending on depth rating and options. Expedited delivery (6‑8 months) available for repeat configurations.

Q9: Do you provide training for the pin‑together assembly method?
Yes – 5 days on‑site training covering module identification, pinning sequence, hydraulic safety, and emergency procedures. We also provide a laminated assembly manual.

Q10: Is the rig suitable for desert or arctic conditions?
Yes – we offer desert packages (55°C, sand pre‑cleaners) and arctic packages (-40°C, heated enclosures, low‑temp hydraulics). Specify your environment at time of order.

Q11: Does the rig include automated pipe handling?
Optional – we can add a hydraulic catwalk, iron roughneck, and auto‑driller. The mast and substructure are pre‑designed to accommodate these upgrades.

Q12: How do I get a quote for a fast installation drilling rig?
Provide: target depth, desired hook load, number of wells per pad, environment (desert/arctic/temperate), and any specific move requirements (walking/skidding). We will respond within 7 business days.

(0/10)

clearall