Products

Home / Products / Dual well drilling equipment

Product Categories

Dual well drilling equipment

Technical Specifications – Dual Well Drilling Equipment

*The table below shows typical equipment specifications. All components are API 4F/7K certified.*

Equipment Category Model Key Specs Weight / Dimensions
Substructure (new dual) SJ‑DWS‑500 Two well centers, 5‑12m spacing, 500k lbs 80,000 kg, 18×9×2m
Substructure (retrofit extension) SJ‑DWE‑500 Bolt‑on to existing substructure 25,000 kg, 9×3×1.5m
Skidding system (sequential) SJ‑SKS‑1000 4 gripper jacks, HPU 100 HP 12,000 kg per set
Walking system (omni) SJ‑WKS‑2000 8 legs, HPU 200 HP 25,000 kg per set
Dual mast set (simultaneous) SJ‑DMS‑700 Primary 700k lbs, auxiliary 300k lbs 80,000 kg total
Dual control cabin SJ‑DCC‑2 2 HMI, 2 joystick sets 3,000 kg, 3×2.5×2.5m
Pipe transfer arm SJ‑PTA‑10 10 ft reach, 25,000 lbs capacity 1,500 kg
Utility bridge SJ‑UB‑20 20 m retracted, 60 m extended 5,000 kg


Applications

Application Equipment Configuration Needed
New land pad drilling (sequential) New substructure + skidding system + single mast
Existing rig upgrade to sequential Retrofit substructure extension + skidding system
Simultaneous drilling (land / offshore) New dual substructure + dual mast set + dual control cabin + pipe transfer
Multi‑row pad (skid + walk combo) Skidding system + walking system (for row changes)
Offshore platform slot drilling Compact skidding system + marine coating + remote control
Workover pad campaigns Light‑duty skidding (200k lbs substructure)

Product Types – By Equipment Function

Equipment Family Purpose Components Included
Substructure & foundations Support dual well centers Main substructure, extension kit, well head adapters
Movement systems Move rig between wells Skid beams, gripper jacks, walking legs, HPU, controls
Masts & top drives Drilling on two centers Primary mast, auxiliary mast, top drives, elevators
Controls & cabins Operate dual rig Centralized cabin, PLC, HMI, CCTV, e‑stops
Pipe & utility transfer Move pipe/utilities between centers Transfer arm, utility bridge, hose/cable trays
Retrofit kits Upgrade single rigs Extension beam, skid mount kit, control interface

We also supply complete integrated dual well rigs – all components pre‑engineered and factory tested. Lead time: 12‑18 months.

Why Choose SJ Petro for Dual Well Drilling Equipment?

1. Field‑Proven Hardware – Our dual well substructures, skidding systems, and mast sets have been deployed on over 50 rigs across China, Middle East, and Americas.

2. API 4F / 7K Certified – Every structural component, hoisting device, and control system meets API standards. Full traceability.

3. Retrofit Expertise – We have upgraded over 20 existing single‑well rigs to dual well capability. Our bolt‑on extension kits require minimal welding and no new rig purchase.

4. Fast Installation – New substructure installation: 10‑14 days. Retrofit extension: 5‑7 days. Skidding system add‑on: 3‑5 days.

5. Interchangeable Components – Skidding jacks, control modules, and utility bridges are common across our product line – reduces spares inventory.

6. Global Support – Spare parts for hydraulic cylinders, control valves, and wear plates stocked in Houston, Dubai, and Singapore.

7. Custom Engineering – Non‑standard well spacing (e.g., 3 meters, 15 meters), special materials (NACE), and extreme climate packages available.

8. Sinopec Backing – Our dual well equipment has been refined through thousands of pad drilling jobs in Sinopec’s own fleet. Not a prototype – a production‑proven system.

Frequently Asked Questions (FAQ)

Q1: What is the difference between dual well drilling "equipment” and a "dual well rig”?
A dual well rig is the complete drilling machine – mast, drawworks, top drive, etc. Dual well equipment refers to the components that enable two‑well operation: the substructure with two well centers, the skidding/walking system, the dual control cabin, and the pipe transfer system. You can add this equipment to an existing single rig to make it a dual well rig.

Q2: Can I retrofit my existing single‑well rig to become a dual well rig?
Yes – with our substructure extension kit and skidding system. You do not need to replace the entire rig. We bolt on a second well center section and add the movement hardware. Total cost is typically 30‑40% of a new dual rig.

Q3: Do I need a dual mast for simultaneous drilling?
Yes – if you want to drill two wells at the same time (true simultaneous), you need two complete masts, top drives, and drawworks. If you only want sequential drilling (one mast skidding between wells), a single mast is sufficient.

Q4: What is the minimum well spacing your substructure can handle?
Standard spacing: 5 meters (16 ft) for simultaneous dual masts; 3 meters (10 ft) for sequential skidding. We can custom design down to 2.5 meters (8 ft) with narrower masts.

Q5: How long does it take to move the rig between wells with your skidding system?
Skidding (sequential): 20‑60 minutes for typical 5‑10 meter spacing. Walking: 45‑120 minutes. Compare to 2‑5 days for conventional rig‑down and truck move.

Q6: Does your dual well equipment require a larger crew?
No – a sequential dual rig uses the same crew as a single rig (6‑8). A simultaneous dual rig typically uses 8‑10 (about 1.5× a single rig) but drills 2× the wells in the same time – far lower crew cost per well.

Q7: Can the equipment handle drilling in arctic or desert conditions?
Yes – arctic package includes heated substructure, low‑temp hydraulic fluid, and insulated control cabin (‑40°C). Desert package includes oversized coolers, sand filters, and UV‑resistant hoses (55°C).

Q8: What is the typical lead time for dual well equipment?
New substructure + skidding: 6‑8 months. Retrofit extension + skidding: 4‑5 months. Dual mast set: 10‑12 months. Full simultaneous dual rig (new): 12‑18 months.

Q9: Do you provide installation and training?
Yes – our field service team supervises installation (1‑2 weeks) and provides 1‑2 weeks of on‑site training for your crew and maintenance staff.

Q10: What API certifications do your components carry?
Substructures: API 4F. Skidding/walking cylinders and controls: API 7K (pumps) and 4F (structural). Dual control cabin: rated for hazardous area (Class I, Div 2).

Q11: Can you design a custom well center spacing for an existing pad?
Yes – we send a survey team to measure your pad layout and existing rig footprint. We then design the substructure extension and skid beams to match your exact well spacing.

Q12: How do I get a quote for dual well drilling equipment?
Provide: current rig specifications (weight, mast type, substructure dimensions), desired operation (sequential or simultaneous), well spacing, and pad layout. We will respond with an equipment list and fixed price within 7 business days.

(0/10)

clearall