Technical Specifications – SJF225DB Fixed Platform Drilling Rig
|
Parameter
|
Value
|
|
Model
|
SJF225DB (Fixed Platform Series)
|
|
Max Hook Load
|
2,250 kN (500,000 lbf)
|
|
Drawworks Rated Power
|
735 kW (1,000 hp)
|
|
Nominal Drilling Depth
|
4,000 m (13,120 ft)
|
|
Workover Depth Capability
|
Up to 6,000 m (19,680 ft) for tubing/concentric operations
|
|
Mast Type
|
K-type offshore mast (API 4F)
|
|
Mast Height (standard)
|
41 m – 43 m (shorter option available for low-clearance platforms)
|
|
Substructure Clearance
|
6 m – 7.5 m (customized to BOP stack height)
|
|
Typical Footprint
|
11m x 9m to 13m x 10m (platform-specific)
|
|
Rotary Table Opening
|
17.5″ to 20.5″ (API standard)
|
|
Control System
|
Si-driller AC-VFD (DC-SCR optional)
|
|
Top Drive Ready
|
Yes (mounting points for NOV, Canrig, Tesco, or SJ)
|
|
Marine Coating
|
C5-M (C5-H optional for extreme environments)
|
|
Certifications
|
API 4F / 7K / 8C, ISO9001, HSE; optional ABS/DNV/BV/CCS
|

Where the SJF225DB Delivers Value
This rig is the right answer for a long list of fixed platform scenarios:
-
Medium-depth infill drilling – 4,000 m wells from existing platforms, including deviated and extended-reach
-
Heavy workover & recompletion – Pulling large-diameter production strings, ESP replacements, milling operations
-
Platforms with moderate deck load limits – More capacity than a light rig, but without overstressing older structures
-
Wellhead platform drilling – Satellite platforms where a full-size rig won’t fit but a light rig is underpowered
-
Mature field redevelopment – Drilling infill wells on platforms originally designed for lighter workover loads
-
Plug & abandonment campaigns – Sufficient hook load for pulling long casing strings during decommissioning
Real-world deployments (examples):
-
SJF225DB (and similar SJF series rigs) have been supplied to CNOOC for Bohai Bay fixed platform programs
-
Exported fixed platform drilling rigs of this class to Malaysia and Southeast Asia
-
Used by independent operators in the Middle East for platform drilling campaigns
Product Types – SJF Fixed Platform Drilling Rig Series
|
Model
|
Hook Load
|
Power
|
Drilling Depth
|
Best Fit
|
|
SJF180DB
|
1,800 kN
|
550 kW / 750 hp
|
3,000 m
|
Small platforms, light infill & workover
|
|
SJF225DB
|
2,250 kN
|
735 kW / 1,000 hp
|
4,000 m
|
Medium platforms, deeper wells, heavier workover
|
|
SJF315DB
|
3,150 kN
|
1,100 kW / 1,500 hp
|
5,000 m
|
Larger fixed platforms, deep drilling
|
|
SJF450DB
|
4,500 kN
|
1,470 kW / 2,000 hp
|
6,000 m
|
Heavy drilling on major platforms
|
All models available in AC-VFD (DB) or DC (D) drive. For lighter workover-only needs, see our SHXJ series fixed platform workover rigs.
OEM & Customization – Designed to Fit Your Platform, Not the Other Way Around
Fixed platforms come in all shapes, ages, and conditions. The SJF225DB is a standard design – but we rarely ship one without customizing it to the customer’s specific deck.
What we tailor for you:
-
Footprint & skid geometry – We adjust base dimensions to land on your existing deck beams, avoiding overhangs and weak spots
-
Mast height reduction – For platforms with low overhead clearance (crane beams, flare booms, helidecks), we can lower mast height by up to 5 meters
-
Substructure clearance – Matched exactly to your BOP stack, diverter, and wellhead Christmas tree
-
Deck load distribution – We calculate existing platform capacity from your structural drawings (or as-built sketches) and design skid beams to spread load optimally
-
Power interface – Direct connection to platform generators (custom voltage/frequency) or standalone power skid
-
Top drive integration – Pre-engineered mounts, wiring, and cooling for the brand you specify
-
Corrosion upgrade – C5-M standard; C5-H (high durability) with additional stainless steel and anodic protection for North Sea or tropical ultra-humid environments
-
Classification society – We manage ABS, DNV, BV, CCS certification from application to final stamp
-
Control system integration – Si-driller standard; custom data export to your platform SCADA or remote monitoring center
Our customization process – transparent and engineering-led:
-
You send us: Platform deck general arrangement (PDF or CAD), well bay layout, available power (kVA, voltage, phase, frequency), target well depth and casing sizes, any overhead clearance constraints.
-
Our in-house engineering team (314 technical staff, including post-doctoral researchers) builds a 3D integration model showing the rig placed on your deck.
-
You review – we adjust layout, mast height, skid position until you approve.
-
We fabricate in our 50,000 m² yard with 24 rig-up positions.
-
We test – full proof load at our 750-ton offshore commissioning facility. You’re invited to witness FAT on-site or via live video link.
-
We deliver – fully assembled for tow-out, or knocked down for container shipment.
Why Choose SJ for Your SJF225DB?
|
Sinopec Subsidiary
|
Direct backing from Sinopec Oilfield Equipment – financial strength, supply chain, and long-term commitment
|
|
30+ Years Offshore
|
Since 1993. Produced China’s first skid-mounted offshore workover rig. Awarded national innovation prize for 158-ton Bohai Bay rigs
|
|
40+ SJ Offshore Rigs Delivered
|
Over 40 SJ offshore drilling and workover units operating in Chinese and SE Asian fields
|
|
400+ SOFE Offshore Sets
|
Sinopec Oilfield Equipment group has produced more than 400 large-scale offshore equipment sets worldwide
|
|
Right-Sized Engineering
|
The SJF225DB is purpose-built for the medium-duty segment – not an underpowered light rig or an oversized heavy rig. You pay for what you need
|
|
In-House R&D Power
|
314 technical personnel, post-doctoral station, three specialized research institutes. No reliance on outsourced engineering
|
|
Global Export Track Record
|
297 drilling rigs exported via SOFE group: Americas (113), Russia (102), MENA (49), SE Asia (33)
|
|
Third-Party Inspection
|
Our accredited subsidiary SJPETRO provides independent inspection, NDT, and calibration – or bring your own surveyor
|
|
API / ISO / HSE
|
Plus optional ABS, DNV, BV, CCS – we handle the entire certification process
|
Frequently Asked Questions (FAQ)
Q1: How is the SJF225DB different from the SJF180DB?
A: The SJF225DB has 25% more hook load (2,250 kN vs 1,800 kN) and 33% more drawworks power (735 kW vs 550 kW). It drills 1,000 meters deeper (4,000 m vs 3,000 m) and handles larger casing sizes. It also has a taller mast, heavier substructure, and larger rotary table opening. Think of it as a full step up in capability, not just a tweak.
Q2: Our fixed platform was built in the 1990s. Can it take the weight of this rig?
A: Possibly yes – and we’ve done this on several platforms in Bohai Bay and Southeast Asia. Send us your platform’s structural drawings (or as-built sketches if originals are missing). Our engineers will calculate existing deck load capacity and design a skid base that distributes the SJF225DB’s weight across multiple beams. If the platform is truly marginal, we can recommend a lightweight version with reduced dead weight (using higher-strength alloys and a shorter mast). No obligation feasibility study available.
Q3: What’s the smallest footprint you’ve delivered for an SJF225DB?
A: About 11m x 8.5m for a workover-focused configuration with reduced mast height and no top drive. For full drilling with top drive and full pipe racking, figure 13m x 10m. We need your well bay dimensions to give you an exact number.
Q4: Does the rig come with a top drive?
A: The base package is kelly drive. We can integrate a top drive as an option – NOV, Canrig, Tesco, or our own SJ design. The mast comes with pre-drilled mounting points and the control system includes top drive interlocks. Adding a top drive adds about 3–4 months to delivery due to third-party lead times (unless you supply your own top drive).
Q5: Can we use the SJF225DB for workover only, without drilling?
A: Absolutely. In fact, many customers buy this rig primarily for heavy workover (pulling large pumps, milling packers, fishing) and then discover they can drill infill wells with the same unit. The SJF225DB is a true dual-purpose rig – you don’t pay for separate drilling and workover packages.
Q6: What certifications come standard? Can you get DNV?
A: Standard: API 4F (mast & substructure), 7K (drawworks), 8C (hoisting), ISO9001, HSE. For DNV, ABS, BV, or CCS, we obtain certification as an option. We’ve done this for multiple export rigs – allow an additional 2–3 months for class society review and surveys.
Q7: Do you provide offshore commissioning and training?
A: Yes. Our field service team will mobilize to your platform for installation supervision, hook-up, system commissioning, and crew training. Typical on-site duration: 3–4 weeks. We also offer remote support via the Si-driller telemetry system after handover.
Q8: What about spare parts availability – especially for remote platforms?
A: We maintain a consigned spares inventory for high-wear items: drawworks brake pads, hydraulic seals, sensors, VFD control boards, etc. For active long-term campaigns, we can set up a local spares consignment at your onshore supply base. Major components (drawworks drum, mast sections) have 4–8 week lead times.
Q9: We already have a BOP and choke manifold on the platform. Will the SJF225DB connect without replacing them?
A: Almost certainly. Our high-pressure manifolds are fully interchangeable with major global brands (Cameron, NOV, etc.). Send us the make, model, and connection types of your existing equipment. We’ll supply adapters or modify our interfaces to match. We don’t force you to replace serviceable third-party components.
Q10: Can we witness factory acceptance testing?
A: Yes – and we strongly recommend it. Our 750-ton load test facility allows full mast and substructure proof-loading to API 4F. You can bring your own third-party surveyor or use our accredited subsidiary SJPETRO for independent verification. Virtual FAT (live video with remote witness) is also available.
Q11: What is the typical lead time for an SJF225DB?
A: Standard configuration with minor customization (footprint adjustment, standard coating, no class society) – 8–9 months. Full custom (reduced mast height, class society certification, non-standard power) – 10–12 months. Contact us with your target delivery date for a firm schedule.
Q12: Has the SJF225DB been exported outside China?
A: Yes. SJF series rigs (including the 225) have been supplied to Malaysia and Southeast Asia. The broader Sinopec Oilfield Equipment group has exported drilling rigs to the United States, Russia, Middle East, and North Africa. We can provide references upon request (subject to customer approval).
Tag: