Products

Home / Products / Fast installation drilling rigs

Product Categories

Fast installation drilling rigs

Technical Specifications – Fast Installation Drilling Rigs

BE Series Fast Installation Rigs (Trailer‑Mounted Integrated)

Parameter BE550 (ZJ40/2250D‑BE) BE770 (ZJ50/3150D‑BE) BE1100
Nominal depth (4‑1/2″ DP) 4,000 m 5,000 m 6,000‑7,000 m
Max. hook load (kN / t / lb) 2,450 / 245 / 550,000 3,430 / 343 / 770,000 5,000+ / 500+ / 1,100,000+
Drawworks power (HP) 1,000 1,500 2,000‑2,500
Drive type AC VFD AC VFD AC VFD
Transport modules 6‑7 6‑8 7‑9
Crane required? No (hydraulic self‑erecting) No No
Rig‑up time (hours) 8‑12 10‑16 12‑20
Walking/skidding option Optional Optional Optional
Operating temp -35°C to +50°C -35°C to +50°C -40°C to +55°C


ZJ Fast Installation Series (Modular/Pin‑Connected)

Parameter ZJ40‑FI ZJ50‑FI ZJ70‑FI ZJ90‑FI
Nominal depth (m) 4,000 5,000 7,000 9,000
Max. hook load (kN) 2,250 3,150 4,500 6,750
Drawworks power (HP) 1,000 1,500 2,000 3,000‑4,000
Drive type AC VFD AC VFD AC VFD AC VFD
Transport modules 11‑12 12‑13 13‑14 14‑16
Max. module weight (t) 40 42 45 50
Pin‑connected assembly Yes Yes Yes Yes
Hydraulic mast raising Optional Optional Standard Standard
Rig‑up time (days) 3‑5 3‑6 4‑7 5‑8
Operating temp -35°C to +50°C -35°C to +50°C -40°C to +55°C -40°C to +55°C

Product Types – Fast Installation Drilling Rig Configurations

Type Family Depth Range Transport Style Crane‑Free? Best For
BE550 (ZJ40/2250D‑BE) BE 4,000 m Trailer dolly Yes US shale, Middle East, medium‑depth fast campaigns
BE770 (ZJ50/3150D‑BE) BE 5,000 m Trailer dolly Yes US deep gas, Middle East development
BE1100 BE 6,000‑7,000 m Trailer dolly + additional Yes Frontier US plays, extended‑reach campaigns
ZJ40‑FI (Fast Install) ZJ 4,000 m Modular skid + pin Optional Deep wells where depth matters more than per‑move speed
ZJ50‑FI ZJ 5,000 m Modular skid + pin Optional HPHT deep gas, permafrost zones
ZJ70‑FI ZJ 7,000 m Modular skid + pin Standard Ultra‑deep frontiers, Middle East HPHT, Rosneft‑class rigs
ZJ90‑FI ZJ 9,000 m Modular skid + pin Standard 9,000 m+ HPHT exploration, scientific drilling

Options for all models:

  • Hydraulic walking system: moves entire rig between wells without dismantling.

  • Caterpillar / Cummins power: tier engines for emissions compliance.

  • Top‑drive integration: our in‑house or customer‑specified brand.

  • Automated pipe handling: catwalk, iron roughneck, racking arm.

  • Remote monitoring: real‑time data transmission to central office.

  • Winterization package: -45°C low‑temp configuration.

  • Desert package: sand‑sealed enclosures, oversized cooling.

Applications – Where Fast Installation Rigs Deliver Maximum Value

Application Why Fast Installation Rig Typical Rig‑Up Time Saved Business Impact
Multi‑well pad drilling (shale / tight oil) Same rig must move across 10‑30 wellheads without being dismantled. Fast installation + walking system = continuous drilling. 2‑3 weeks per pad Increase wells drilled per year by 30‑40%
Short‑term exploration campaigns (remote basins) Rig may be moved 5‑10 times per campaign. Each day saved in rig‑up is a day added to production. 7‑10 days per move Reduce campaign duration by 25‑40%
Middle East high‑density development 50°C heat and sandstorms demand rapid setup. Reducing exposed rig‑up hours improves crew safety and equipment survival. 4‑8 days per rig‑up Lower HSE risk, less weather‑related delay
Offshore platform infill drilling Deck space is limited, crane availability is constrained. Modular fast‑install rigs assemble through platform hatches using existing cranes. 2‑4 weeks vs. conventional platform rig Accelerate platform development by months
Arctic / permafrost zone drilling Drilling windows are short (3‑4 months/year). Every day of rig‑up cuts into production days. Fast installation maximizes utilization of the winter window. 7‑14 days per move Drill one extra well per winter season
Emergency relief / escape wells When a blowout or well control event occurs, every hour counts. Fast installation rigs can be on site and drilling before conventional rigs finish mobilizing. Days vs. weeks Potentially life‑saving speed

Why Choose SJ Petro for Fast Installation Drilling Rigs?

1. We Pioneered the Fast‑Installation Concept – Not a Copy

The BE (Big Easy) series was co‑developed by SJ Petro and its US partner, and the concept has been hailed as "a modern land drilling rig” by American Oil & Gas Magazine. SJ Petro holds the China national invention patent for "a drilling rig capable of fast disassembly and assembly and its moving method.” When you buy a BE rig from us, you are buying the authentic fast installation platform—not a reverse‑engineered imitation.

2. Proven in the World's Most Demanding Fast‑Move Markets

  • 75+ BE rigs exported to the United States, Middle East and other countries.

  • 20 BE550 rigs delivered under a single 2008 export contract to the US.

  • 6 × 9,000 m ultra‑deep AC VFD rigs delivered to Kuwait Oil Company (KOC), all commissioned ahead of schedule.

  • 11 × ZJ40DB low‑temperature fast installation rigs delivered to Rosneft for Western Siberia operations.

3. Two Product Families – BE for Extreme Speed, ZJ for Extreme Depth

The BE series optimizes for minimum rig‑up hours (8‑16 hours, 6‑8 modules). The ZJ series offers greater depth capacity (up to 9,000 m) while retaining fast installation features (11‑16 modules, pin‑connected assembly, optional hydraulic mast raising). You choose the balance that fits your campaign.

4. API‑Certified – Full Compliance for Global Export

All BE and ZJ fast installation drilling rigs are designed and manufactured to API 4F (masts and substructures), API 7K (drawworks), API 8C (top drives) and API Q1 (quality management). Full material traceability, weld maps and pressure test records are provided with every rig.

5. Backed by Sinopec – Financial Strength and Global Reach

As a wholly‑owned subsidiary of Sinopec Oilfield Equipment Corporation, part of the Fortune Global 500 Sinopec Group, SJ Petro offers:

  • Unmatched financial stability: no concerns about supplier bankruptcy.

  • Global supply chain: access to the world's largest industrial distribution network.

  • Decades of drilling experience: Sinopec operates thousands of wells annually across every climate zone.

6. Complete After‑Sales Ecosystem

Fast installation rigs require fast support. SJ Petro provides:

  • 24/7 remote diagnostics: engineers log into the control system (with permission) to troubleshoot.

  • On‑site commissioning and training: included with every rig.

  • Regional parts hubs: Dubai (Middle East), Houston (Americas), Singapore (Asia‑Pacific) stock fast‑installation spares.

  • Field service: emergency response and major repairs available globally.

7. Flexible Commercial Models

Fast installation rigs are available through:

  • Outright purchase: standard 30/40/30 payment terms, 18‑month warranty.

  • Operating lease: 12‑60 months, maintenance included.

  • Short‑term rental: 3‑12 months, ideal for single campaigns.

  • Lease‑to‑own: 24‑36 months, ownership transfers at term end.

FAQ – Fast Installation Drilling Rig

Q1: What is a fast installation drilling rig – and how is it different from a standard rig?

A: A fast installation drilling rig is engineered for rapid mobilization and rig‑up. It uses trailer‑mounted (BE series) or modular pin‑connected (ZJ series) structures, hydraulic self‑erecting masts, pre‑integrated utilities and crane‑free assembly. A conventional rig may require 20‑35 truckloads and 2‑3 weeks to rig up. A BE series rig requires 6‑8 loads and 8‑16 hours.

Q2: What is the difference between BE series and ZJ series fast installation rigs?

A: BE (Big Easy) series is optimized for maximum installation speed (8‑16 hours, 6‑8 modules, crane‑free) and is ideal for US shale, Middle East desert and frequent‑move campaigns. ZJ series offers greater depth capacity (up to 9,000 m) while retaining fast‑installation features (11‑16 modules, pin‑connected, hydraulic mast optional). Choose BE for speed; choose ZJ for depth.

Q3: How many truckloads does it take to move a BE fast installation rig?

A: A complete BE550 rig requires 6‑7 trailer loads. The BE770 requires 6‑8 loads. The larger BE1100 requires 7‑9 loads. This is drastically fewer than conventional rigs of equivalent capacity, which may require 20‑35 loads.

Q4: Can I install the rig without a crane?

A: Yes. The BE series is completely crane‑free: mast, substructure and all major components are raised hydraulically from the trailers. The ZJ series can be rigged up with a crane, or optionally equipped with hydraulic mast raising for crane‑free installation.

Q5: How long does it take to rig down and move to the next well?

A: For the BE series, rig‑down time is similar to rig‑up: 6‑10 hours depending on the crew. For the ZJ series, rig‑down typically requires 2‑4 days. On a walking‑equipped rig (BE or ZJ), the entire rig moves between wellheads in hours without dismantling.

Q6: Does the fast installation rig sacrifice capacity or depth for speed?

A: No. The BE770 provides 770,000 lb hook load and 5,000 m depth while rigging up in under 16 hours. The ZJ70‑FI provides 4,500 kN hook load and 7,000 m depth with pin‑connected assembly. Speed does not come at the expense of performance.

Q7: Can I use a fast installation rig in extreme cold or extreme heat?

A: Yes. Both BE and ZJ series are available with:

  • Arctic package: -45°C low‑temp steel, heated hydraulic tanks, engine block heaters, cold‑start batteries, GOST certification.

  • Desert package: sand‑sealed enclosures, oversized radiators, pressurized control cabins, 55°C operation.

Q8: How do I get a quote for a fast installation drilling rig?

A: Contact our fast installation rig sales team with:

  • Target depth and hook load requirement.

  • Expected number of wells and pad layout.

  • Operating environment (desert, arctic, offshore).

  • Preferred family (BE for speed, ZJ for depth).

  • Mobility requirement (walking, skidding, or conventional move).

We will provide a custom proposal including rig model recommendation, module count, transport analysis, rig‑up time estimate and budget price – within 10 working days.

(0/10)

clearall